Clemens Pork Processing

Clemens Pork Processing Waste Water Treatment Plant Clemens Pork Processing Waste Water Treatment Plant Clemens Pork Processing Waste Water Treatment Plant Clemens Pork Processing Waste Water Treatment Plant Clemens Pork Processing Waste Water Treatment Plant Clemens Pork Processing Waste Water Treatment Plant Clemens Pork Processing Waste Water Treatment Plant Clemens Pork Processing Waste Water Treatment Plant Clemens Pork Processing Waste Water Treatment Plant
Waste Water Treatment Plant

Award Winning Project

  • 2019 ACEC Engineering and Surveying Excellence Merit Award

Design Program: 

Clemens Food Group, a Pennsylvania based company, recently began construction of a new $250 million pork processing facility in Coldwater, Michigan. The project is anticipated to generate $255.7M in total capital investment, bring 800 new jobs and have an initial production rate of 10,000 hogs per day.  To support Clemens Food Group’s new Pork Processing Facility, Byce & Associates, Inc. is responsible for the design of the associated 1.0 million gallons per day Waste Water Treatment Plant in collaboration with LD Docsa Associates, Inc. and Redox Water Technology B.V.  Byce & Associates, Inc. provided architectural and engineering services that included the design of the following various waste water tanks and building foundations:

Concrete Tanks

  • Two above-ground 132 feet in diameter by 23 feet tall Denitrification/Aeration Tanks.
  • One 66 feet in diameter by 20 feet tall above grade influent buffer tank.
  • One 33 feet in diameter by 20 feet tall above grade Re-use water tank with concrete lid=
  • One 24 feet by 17 by 17 feet deep underground contact tank (within the building).

Building

  • 130 feet by 100 feet pre-engineered metal building with 2” insulated metal wall & roof panels.
  • 30 feet by 35 feet waste container room for two roll off containers.  Class 1, Division 1 rating requirement
  • 30 feet by 35 feet concrete equipment platform above the waste container room to support decanter equipment.
  • 50 feet by 17 feet blower room.
  • 22 feet by 12 feet office and lab room.
  • 38 feet by 12 feet control room.